50 Recurring Contractual Nightmares By John Knowles

50 Recurring Contractual Nightmares By John Knowles
Item# newitem1701304339

Description

“50 Recurring Contractual Nightmares” is a practical and highly focused construction law seminar paper that tackles common contractual disputes faced by contractors, subcontractors, employers, architects, and engineers. Its strength lies in turning complex legal issues—such as extensions of time, liquidated damages, variations, payment disputes, notices, defects, disruption claims, and retention of title—into direct question-and-answer discussions. The material is case-law driven and useful for understanding how courts and arbitrators have approached recurring construction contract problems. Although some standard forms and legal references may now need updating, the document remains valuable as a practical guide to the risks, arguments, and remedies that commonly arise in construction contracts.



Roger Knowles comes across as a highly experienced and practical construction-contracts specialist and his qualifications are FRICS, FCIArb, a barrister, and Chairman and Managing Director of James R. Knowles Construction Contracts Consultants, with extensive lecturing experience across the UK, Europe, the Middle East, and the Far East. His background as a legal correspondent, industry journal contributor, contracts adviser, and former member of the Joint Contracts Tribunal gives the material strong professional authority. Overall, he is a practitioner-author whose strength lies in explaining difficult construction claims and contractual disputes in a direct, case-based, and commercially useful way.



1. Does a contractor or subcontractor lose entitlements to extensions of time due to a failure to submit the appropriate details required by the contract?



2. If the Architect/Engineer issues a variation after the extended completion date but before practical completion, can an extension of time be granted, or will time become at large rendering liquidated damages no longer enforceable?



3. What is meant by “time at large”?



4. It has been said that a claim for an extension of time and the recovery of loss and expense which does not precisely detail the period of delay and the amount claimed in respect of each claim matter causing delay will fail. Is this correct?



5. When an Architect/Engineer is considering a contractor’s application for an extension of time, can he reduce the period to which the contractor is entitled to reflect time saved by work omitted?



6. What is meant by a contractor or subcontractor having to “constantly use his best endeavours to prevent delay”?



7. Can a contractor challenge the liquidated damages figure included in a contract as being a penalty and unenforceable after the contract is signed? If so, will it be a matter for the Employer/Purchaser to prove the figure to be a reasonable pre-estimate of anticipated loss?



8. May an Employer/Purchaser levy liquidated damages if, in the final analysis, he suffers no loss as a result of the contractor’s late completion?



9. If the Architect fails to issue a proper non-completion certificate, will this prevent the Employer from deducting liquidated damages?



10. Where “with contractor’s design” conditions apply, which takes precedence where a discrepancy occurs between the Employer’s requirements and the Contractor’s proposals?



11. Must a contractor or subcontractor notify the Architect/Engineer of defects or errors in the Architect’s or Engineer’s design?



12. Can a contractor/subcontractor be forced to carry out a variation after practical completion?



13. Where work is omitted from the contract by way of a variation order, can a contractor or subcontractor claim for loss of profit?



14. Is it correct that an Employer/Purchaser can legitimately refuse to honour an Architect’s or Engineer’s certificate on spurious grounds?



15. Is there a way round the problems experienced by subcontractors with “pay when paid” clauses?



16. What is the effect of a letter of intent? If the contractor commences design, orders materials, fabricates, or starts on site, is he entitled to be paid if the contract does not go ahead?



17. Can a contractor or subcontractor legitimately walk off site if payment is not made when due?



18. Are the standard conditions of subcontract adequately worded to protect subcontractors from rogue main contractors who merely set off claims, whether real or fabricated, from sums due to the subcontractor?



19. When an Employer becomes insolvent, is a main contractor obliged to pay his domestic and nominated subcontractors?



20. Where a contractor/subcontractor includes, in error, an unrealistically low rate in the Bills of Quantities, can he be held to the rate if the quantities substantially increase?



21. Where an Architect/Engineer undercertifies, is the contractor/subcontractor entitled to claim interest?



22. Is a Quantity Surveyor empowered to alter hours which he considers to be excessive on a signed daywork sheet?



23. Once the value of a contractor/subcontractor’s work has been certified and paid, can it be devalued in a later certificate?



24. Where a final account and claim have been signed in full and final settlement, but subsequently it is discovered that an entitlement has not been included, can the matter be reopened?



25. Where, at the end of the defects liability/maintenance period, the Architect/Engineer draws up a defects list but, due to an oversight, omits certain defects, and a second list is prepared after the defects on the first list have been completed, will the contractor/subcontractor be obliged to make them good?



26. Is it correct for costs in respect of extended preliminaries to be evaluated using the rates and prices in the Bills of Quantities?



27. Where an Employer/Purchaser includes with the tender enquiry documents a site survey which proves misleading, can this be the basis of a claim?



28. What methods of evaluating disruption have been accepted by the courts?



29. Can an Employer/Purchaser recover from the contractor the time and cost of defending a claim which is settled at a sum substantially less than the amount claimed?



30. When a contractor/subcontractor fails to serve a proper claims notice or does not submit details of the claim as required by the contract, can the Architect/Engineer legitimately reject the claim?



31. Where a contractor/subcontractor’s programme is shorter than the contract period, can the contractor/subcontractor claim extra costs if the Architect/Engineer issues drawings too late to ensure completion within the programme period?



32. Are claims for the recovery of head office overheads using the Hudson or Emden formulae enforceable in court or arbitration?



33. Are contractors/subcontractors entitled to be paid finance charges as part of their claims from the date the extra cost or loss first occurs?



34. Is a contractor/subcontractor entitled to be paid loss of profit as part of a monetary claim?



35. Is a contractor/subcontractor entitled to be paid acceleration costs as part of his monetary claim?



36. Once a contractor has submitted a fully detailed claim, can he subsequently change his mind and resubmit the claim showing an increased amount?



37. Where a main contractor is delayed by several domestic subcontractors and, as a result, has to pay liquidated damages to the Employer/Purchaser, how does the main contractor allocate the liquidated damages he has to pay among the defaulting subcontractors?



38. Does a quantum meruit valuation have to be based upon a contractor’s/subcontractor’s cost, or are there other methods of evaluation?



39. How is completion defined under the various standard forms of contract?



40. Where a subcontractor’s materials incorporated in part completed or finished work are damaged, who bears the cost?



41. Can an Architect/Engineer sign a daywork sheet “for record purposes only” and then refuse to certify for payment the sum included therein?



42. Where a contractor’s/subcontractor’s drawings are “approved”, “checked”, “inspected”, etc. by the Architect/Engineer and subsequently an error is discovered, who bears the cost?



43. Can an Architect/Engineer condemn large areas of work at the final inspection, having visited the site regularly and included payment for the work in earlier certificates?



44. Where a contractor submits a programme which is accepted by the Architect/Engineer, is he obliged to follow it, or can he amend it at his own discretion?



45. Can an Architect refuse to issue a Certificate of Completion where work has satisfactorily been finished except for commissioning the mechanical and electrical work?



46. How can the term “regularly and diligently”, as used in some standard forms of contract, be defined?



47. Where a specification includes a named supplier “or other approved”, can the Architect/Engineer refuse without good reason to approve an alternative supplier proposed by the contractor/subcontractor?



48. Can suppliers hide behind exclusion clauses in their terms of trading to avoid claims for supplying defective goods or claims based on late supply?



49. Are there any restrictions on an Architect’s/Engineer’s powers where the specification calls for the work to be carried out to the Architect’s/Engineer’s satisfaction?



50. Do retention of title clauses still protect a supplier or subcontractor where a main contractor becomes insolvent, or have there been recent cases which throw doubt on their effectiveness?